Industrial Complex for Solid Radwaste Management (ICSRM) at Chernobyl NPP

After an international tendering process NUKEM was awarded to build the Industrial Complex for Solid Radwaste Management (ICSRM) at the Chernobyl Nuclear Power Plant. The Contract is a turnkey contract. It governs the design, analyses, licensing support, fabrication, assembling, testing, inspection, quality assurance, documentation, delivery, erection and pre-commissioning of structures, foundations, systems, materials, equipment, components, services and other required items, of the ICSRM, to support the safe retrieval, receipt sorting for all radwaste, processing and disposal for solid Low and Intermediate Level Waste Short-Lived (LILW-SL), and temporary storage and disposal for Low and Intermediate Level Solid Waste Long-Lived (LILW-LL) and High Level Waste (HLW), which are currently stored on the ChNPP site or will be generated during the decommissioning operations.

more...   (PDF-File)

Projekte in der Ukraine

Kontakt

Heiko Eichhorn
Project Director
T: +49 6023 91 1417
F: +49 6023 91 1515
E: heiko.eichhorn@
nukemtechnologies.de